ACCESSIBLE WC PROJECT UPDATE

The plan is to construct a small extension on the north side of the building across the passage at the top of the existing ramp, encompassing the fire exit door. There will be a new door into a lobby at the top of the ramp, with options to proceed straight ahead to the new accessible […]